Transmission Line Charging
To initially charge the transmission line, the generator voltage stably controlled from 30% of the rated voltage to 110% of the rated voltage by using AVR. The change-over switch (43CH) for initial transmission line charging is mounted on the operator’s desk in the main control room.This Voltage Changes are required because of the Stray capacitance effect at the charging and boosts the Voltage at the other end and the inductance of the line drops the Voltage soon after charging.